Back to see the build

Solar panels installed

2 min read 15th July 2026

Solar panels installed

Build New

With the roof and external areas of the Greenlinc Renewables Stand completely repainted, solar panels have been installed on the roof.

A new battery storage area has been built outside the stadium which will store electricity generated by the panels.