Solar panels installed
2 min read
15th July 2026
Solar panels installed
Build
New
With the roof and external areas of the Greenlinc Renewables Stand completely repainted, solar panels have been installed on the roof.
A new battery storage area has been built outside the stadium which will store electricity generated by the panels.